Fajr II project is located in an area of 7.4 hectares in Mahshahr Special Economic Zone, Site 2. The project involves the construction of four gas units each with a capacity of 162 MWs (with a total capacity of 648 MWs) together with a 132-kV indoor GIS substation with a double busbar design as well as its steam section which includes two HRSGs each with the capacity of 310 tons and an auxiliary boiler with the capacity of 165 tons (with a total capacity of 785 tons).