MAPNA Group’s HQ Adopts Homegrown Battery Energy Storage System Ahead of Summer Energy Demand
The main building of MAPNA Group in Tehran has been equipped with a homegrown Battery Energy Storage System (BESS), marking the first installation of a
The main building of MAPNA Group in Tehran has been equipped with a homegrown Battery Energy Storage System (BESS), marking the first installation of a
Phase II of Semnan Power Plant was inaugurated on April 18, 2024, by Iran’s high-ranking officials.The opening ceremony was attended by Iranian President Ebrahim Raisi,
Phase II of MAPNA-Developed Semnan Power Plant Inaugurated Read More »
MAPNA Group’s oil and gas subsidiary, Neyr Perse, has received a provisional acceptance certificate (PAC) for Units I and II of the Dowrahan compressor station.Located
Two Units of Dowrahan Compressor Station Receive PAC Read More »
MAPNA Group received a final acceptance certificate (FAC) for the 1st gas unit of Khorramabad Combined Cycle Power Plant on April 8, 2024.With the final
Khorramabad Power Plant: MAPNA Obtains FAC for 1st Gas Unit Read More »
MAPNA Power Plants Construction & Development Company (MD-1) has successfully renewed its Level-1 Certificate of Competency for EPC contracting in the power sector while achieving
MAPNA’s MD-1 Obtains Certificates of Competency for EPC Projects in 3 Fields Read More »
MAPNA Group recently held its Nowruz Convention, a lively event that marked the start of the new year. MAPNA Group President Mohammad Owliya was present,
MAPNA Group Marks Nowruz with a Look Back at Achievements, a Roadmap for Growth Read More »
In a significant boost to Iran’s electricity supply, MAPNA Group has successfully introduced an additional 490 megawatts to the national grid in the last ten
MAPNA Group Boosts Iran’s National Grid with 490 MWs Read More »
Tehran’s Metro Line 6 opened three news stations with MAPNA Rail Construction and Development Company playing a key role. The new stations are “Bahar Shiraz”
Metro Line 6 Opens Three New Stations with Major Contribution from MAPNA Read More »
Iran’s Oil Ministry signed major contracts with domestic contractors, including MPNA Group, to boost pressure in the South Pars gas field, which the country jointly
MAPNA Joins $20 Billion Project to Enhance South Pars Gas Field Production Read More »
The MAPNA Group’s board of directors conducted a comprehensive review of the Rudshur Combined Cycle Power Plant, on March 3, 2024. This follows a prior
MAPNA Aiming to Connect Rudshur Power Plant to National Grid Ahead of Summer Demand Read More »