Capacity: 162 MWs

Units Configuration: 1×162-MW

Status: Commissioned

Located in Iraq, Heidarieh Power Plant features a gas unit with a capacity of 162 MWs under ISO conditions. This unit is equipped with a MAP2+ turbine and utilizes a control system known as MAPCS, developed by MAPNA Electric & Control Engineering & Manufacturing Company (MECO).

MAPNA Group took over the land for the plant on July 12, 2012, and construction commenced on August 4 of the same year. Through the collective efforts of MAPNA Group experts, the plant was synchronized in May 2015. It is located on the Najaf-Karbala road, adjacent to the Najaf refinery at the 25th kilometer mark.

To transmit the generated electricity, a 132 kV substation was established, and MAPNA Group undertook the responsibility for constructing it as a turnkey executive contractor (EPC).