پروژه‌های مپنا

TEHRAN METRO LINE 3 OUTLINE- POWER SUPPLY SYSTEM​

Tehran Metro Line 3 Outline- Power Supply System Project Specifications SCOPE OF PROJECT The scope of work for northern part of Tehran metro line 3 power supply system consists of, designing, engineering, equipment procurement, transportation, installation and commissioning, preparation of engineering documents and drawings, training of Employer’s staff for proper operation, procurement of spare parts […]

TEHRAN METRO LINE 3 OUTLINE- POWER SUPPLY SYSTEM​ Read More »

Karaj Metro Line 2

Karaj Metro Line 2 Project Specifications Karaj Metro Line 2 is one of the two operational lines in the urban rail transportation of Karaj, the capital of Alborz province. It begins at Kamalshahr station on the Karaj-Qazvin Freeway (northwest of Karaj) and ends at Malard (south). This line spans a distance of 27 km and

Karaj Metro Line 2 Read More »

South Pars Phase 14 Development Project

South Pars Phase 14 Development Project Project Specifications The contract for the development of phase 14 of South Pars project has been signed between Pars Oil and Gas Company as client and a consortium comprising MAPNA, Marine Facilities Engineering and Construction, National Drilling, Payandan, Industrial Projects Management of Iran, ISOICO, Arak Machine Manufacturing Company, and

South Pars Phase 14 Development Project Read More »

Supplying and Manufacturing Turbo Compressors for South Pars Phases 22-24

Supplying and Manufacturing Turbo Compressors for South Pars Phases 22-24 Project Specifications   Project Title: Supplying and Manufacturing Turbo Compressors for Phases 22-24 of South Pars gas field Client: Petro Karan Shafagh Kish Contract Type: EPCC Status: Underway   The project involves all the engineering stages, supply, and construction of 16 turbo compressors of 25

Supplying and Manufacturing Turbo Compressors for South Pars Phases 22-24 Read More »

SUPPLY OF 100 TURBO-COMPRESSOR UNITS

Supply of 100 Turbocompressor Units The scope of the contract includes design, supply, manufacture, handover and supervision over installation and commissioning of 100 turbocompressors to be employed in IGAT, Iran’s nationwide gas trunk line network. The project has been carried out in three phases, with the share of localization of the process increasing at each

SUPPLY OF 100 TURBO-COMPRESSOR UNITS Read More »

Qom Monorail

Qom Monorail Project Specifications At its first phase, this EPC Project consists of about 6.8 kilometer Monorail line, 8 stations, one depot and parking, E&M equipment (including power supply system, communication system, signaling system, depot equipment, AFC) and 20 monorail cars. It is going to be via a trilateral consortium including MAPNA Co., Kayson Co.

Qom Monorail Read More »

Tehran Metro Line 6

Tehran Metro Line 6 Project Specifications The Tehran Metro Line 6 project includes design, engineering, procurement of main equipment and spare parts,transportation, installation, test and commissioning, preparation of engineering documents, and personnel training for operation. Once fully operational, Tehran Metro Line 6 will give the capital’s subway system the longest route in Iran. The line

Tehran Metro Line 6 Read More »

Drilling of Sepehr Exploration Well

Drilling of Sepehr Exploration Well Project Specifications The contract for drilling in Sepehr exploration well was signed between MAPNA Group and National Iranian Oil Company Exploration Directorate. Operation started in 2011 in Juffair oil field north of Dezful. Vertical drilling was carried out in Sepehr I exploration well for 465 days at a depth of

Drilling of Sepehr Exploration Well Read More »